(AGENPARL) - Roma, 28 Ottobre 2022 - (AGENPARL) – ven 28 ottobre 2022 October 28, 2022
MEDIA ADVISORY M22-160
NASA to Provide Update on Artemis I Moon Mission
[A view of the Artemis I Space Launch System (SLS) and Orion spacecraft atop the mobile launcher on Launch Pad 39B at NASA’s Kennedy Space Center in Florida on Sept. 15, 2022. ](https://www.nasa.gov/sites/default/files/thumbnails/image/artemis_i_update_advisory_photo.jpg)
artemis_i_update_advisory_photo.jpg
A view of the Artemis I Space Launch System (SLS) and Orion spacecraft atop the mobile launcher on Launch Pad 39B at NASA’s Kennedy Space Center in Florida on Sept. 15, 2022. Also in view are two of the three lightning towers that surround the pad and protect the SLS and Orion from lightning strikes. Artemis I is the first integrated test of the SLS and Orion spacecraft. In future Artemis missions, NASA will land the first woman and the first person of color on the surface of the Moon, paving the way for a long-term lunar presence and serving as a steppingstone on the way to Mars. Credits: NASA/Jason Parrish
NASA will host a media teleconference at 12 p.m. EDT Thursday, Nov. 3, to discuss the status of its [Artemis I](http://www.nasa.gov/artemis-1) flight test that will launch the Space Launch System (SLS) rocket from NASA’s Kennedy Space Center in Florida. The uncrewed mission will send the Orion spacecraft beyond the Moon and back to Earth before future missions with crew.
Audio of the call will livestream on the agency’s website at:
https://www.nasa.gov/live
Briefing participants include:
– Jim Free, associate administrator, Exploration Systems Development Mission Directorate, NASA Headquarters
– Cliff Lanham, senior vehicle operations manager, Exploration Ground Systems Program, Kennedy
NASA is planning to roll the SLS rocket and Orion spacecraft to Launch Pad 39B at Kennedy Friday, Nov. 4, at 12:01 a.m. ahead of launch.
The agency continues to target launch for Monday, Nov. 14, with liftoff planned during a 69-minute launch window that opens at 12:07 a.m. EST. A launch on Nov. 14 would result in a mission duration of about 25-and-a-half days with a splashdown in the Pacific Ocean Friday, Dec. 9.
Through Artemis missions, NASA will land the first woman and the first person of color on the Moon, paving the way for a long-term lunar presence, and serving as a steppingstone to send astronauts to Mars.
For updates, follow along on NASA’s [Artemis blog](https://blogs.nasa.gov/artemis).
-end-
Press Contacts
Kathryn Hambleton / Rachel Kraft
Headquarters, Washington
202-358-1100
Tiffany Fairley / Patti Bielling
Kennedy Space Center, Fla.
321-867-2468 / 321-867-9284
Trending
- Comunicato Stampa 1848/2026 Approvato il Bilancio Consolidato 2025, assessore Giacinti: “Gruppo Regione in salute. Utile di 158 mln e patrimonio netto a 3,4 mld
- Scontri a Milano e violenza giovanile. Maran (PD): «Solidarietà a forze dell’ordine, commercianti e lavoratori. Serve trasparenza sugli algoritmi dei social media»
- Consiglio comunale, approvata l’ottava variazione di bilancio
- EX ILVA, TURCO (M5S): POSSIBILI CONFLITTI DI INTERESSE, CHIAREZZA SULLA POSIZIONE DI BIRRITTERI. DEPOSITATA INTERROGAZIONE A NORDIO
- FDI presenta mercoledi 21 ottobre Osservatorio sulle Città UGL 2026
- IL COMUNE COMUNICA – “Bari in scena: Giovani, Grandi opere e Impatto generazionale”: al via domani il confronto tra istituzioni e studenti sul futuro della città
- [Comune Palermo] Dichiarazione Giaconia – Cantieri CMC a Palermo: “Lavoratori senza stipendio, opere ferme e cittadini e commercianti intrappolati dai cantieri. Il Sindaco convochi subito un tavolo istituzionale” – Allegato
- Comunicato Stampa 1847/2026 Sicurezza idraulica del Guà. Domani a Roveredo incontro con l’assessore Venturini e il sindaco Pastorello
- Indennità regionale fibromialgia 2026 – Rendicontazione delle spese entro il 15 gennaio 2027
- INVITO STAMPA – INCONTRO “ANCORA CENTRALI NUCLEARI? ANCHE NO, GRAZIE
![[NASA HQ News] NASA to Provide Update on Artemis I Moon Mission](https://agenparl.eu/wp-content/uploads/2023/07/nasa.png)