(AGENPARL) – ROME sab 13 maggio 2023 The project consists of two clusters of onshore wind farms. Each wind farm has a capacity between 27 and 49 MW, for an aggregate installed capacity of 613 MW. The first cluster is located in the Brazilian State of Paraiba in the northeast of the country, and is composed of seven sub-projects for a total installed capacity of 239 MW. The second cluster is located in the Brazilian State of Piaui, and is composed of eight sub-projects for a total installed capacity of 374 MW. The operation consists of an allocation under Framework Loan Neoenergia Green Energy FL (2019-0576).