
(AGENPARL) – ROME sab 13 maggio 2023 The project consists of two clusters of onshore wind farms between 14 and 49 MW each. The first wind cluster is located in the Brazilian State of Paraiba in the northeast of the country, and is composed of eight sub-projects for a total installed capacity of 232 MW. The second wind cluster is located in the Brazilian States of Piaui and Bahia in the northeast of the country, and is composed of four sub-projects for a total installed capacity of 192 MW. The aggregate installed capacity is of 424 MW. The operation consists of an allocation under Framework Loan Neoenergia Green Renewable Energy Generation FL (2021-0506).
Fonte/Source: https://www.eib.org/en/projects/pipelines/all/20210594