
(AGENPARL) – ROME mer 15 marzo 2023
Reference:
Release date:
9 February 2023
Promoter – Financial Intermediary
SPRAVA ZELEZNIC STATNI ORGANIZACE
Location
Description
The project supports multiple schemes of railway infrastructure with the aim to:
(i) upgrade, modernise and renew trans-European networks (TEN-T) railway lines
(ii) deploy European Rail Traffic Management System (ERTMS) on railway lines and retrofit of maintenance vehicles with ERTMS equipment
(iii) improve safety of level crossings.
Objectives
The project is expected to increase the quality of rail services provided in the Czech Republic, as well as promote travel by rail, reducing the use of road transport and the associated negative impacts on the local environment, road safety and GHG emissions and, thereby, contribute to the sustainable transport in line with EU objectives. The project is mostly located in EIB Cohesion Priority Regions and by facilitating access promotes regional development.
Several schemes are aimed at increasing the capacity of the existing lines and removing bottlenecks, and thus allowing traffic growth. For some sections, where the works will allow to increase maximum speeds or prevent reduction of maximum speed, it may also generate time savings for passengers. The project will also present environmental and safety benefits due to preventing modal shift from rail to road because of better rail services and improved safety of level crossings, as well as related vehicle operating cost savings. Finally, by means of contributing to achieving interoperability of the EU railway system, the project is expected to improve competitiveness of rail vis à vis other modes; and thereby, enhance sustainable transport.
Sector(s)
Proposed EIB finance (Approximate amount)
CZK 48750 million (EUR 2036 million)
Total cost (Approximate amount)
CZK 97500 million (EUR 4072 million)
Environmental aspects
The project will consist of multiple schemes and their compliance with the requirements of the Environmental Impact Assessment (EIA) Directive 2011/92/EU as amended by Directive 2014/52/EU and the development consents will be reviewed during appraisal. The project’s potential impacts on protected areas and species, in accordance with the Habitats Directive (92/43/EEC) and Birds Directive (2009/147/EC) will also be appraised.
All else equal, the project is expected to have a positive environmental impact by helping the railways to maintain modal share. Furthermore, the project is expected to contribute to climate action and environmental sustainability (CA&ES) objectives, in particular to climate change mitigation.
Procurement
The Bank will require the promoter to ensure that contracts for the implementation of the project have been tendered in accordance with the relevant applicable EU procurement legislation, Directive 2014/25/EU as well as Directive 92/13/EEC as interpreted by the Court of Justice of the EU, with publication of tender notices in the EU Official Journal, as and where required.
Status
Under appraisal – 12/12/2022
Fonte/Source: https://www.eib.org/en/projects/pipelines/all/20220811